Services
Heating/Cooling
Photovoltaic
E-Mobility
Electricity
Gas
Water
Billing Services
About us
Masterplan Energy 2040
Our Company
Our Team
Career
Guided Tours
IBC News
Contact us
Common Concerns
Availability Check
Product Calculator
Report a move
Drinking Water Quality
Smart Meter
ZEV/LEG
Downloads
Forms
FAQs
Your construction projects
Forms
Login Elektroform
Planning information
Work regulations
Search
de
en
Customer portal
Customer portal
Installation request Water
Installer
Installer
This field is mandatory
Clerk
This field is mandatory
Phone Number
Please enter a valid phone number
Email
Please enter a valid mail address
Recipient
First Name
This field is mandatory
Last Name
This field is mandatory
Street
This field is mandatory
House Number
This field is mandatory
Post code/city
Please enter a valid Post Code
Owner
Company
This field is mandatory
First Name
This field is mandatory
Last Name
This field is mandatory
Street
This field is mandatory
House Number
This field is mandatory
Post code/city
This field is mandatory
Object
Street
This field is mandatory
House Number
This field is mandatory
Post code/city
This field is mandatory
Floor, Location
Please enter a floor location
Civil Parish
Please enter pol gem
Parcel No.
Please enter parcel number
Installation
Select installation type
New installation
Extension
Alteration
Decommissioning
This field is mandatory
Building Type
Select building type
Single-family Home
Multi-family Homes
Commercial/Industrial
This field is mandatory
Load Values
Existing (LU)
Please Enter Existing (LU) Load
New (LU)
Please enter New (LU) load
Total (LU)
Please enter total load
Total (l/s)
Please enter total load
Device Types
Device 1
Special Devices (Osmosis, special kitchen device etc.)
This field is mandatory
Make, Size, Type
This field is mandatory
Location
This field is mandatory
SVGW Approval Number
This field is mandatory
Connected Value (l/s)
Please Enter Connected Value
Add Device
Emergency Cooling Systems
Please Enter Emergency Cooling Systems
Location
Please Enter Location
Approval Existing
Yes
Approval Existing
No
Approval Existing
This field is mandatory
Performance (l/s)
This field is mandatory
Water Softener System
This field is mandatory
Location
Please Enter Location
Maintenance contract according to SVGW leaflet W10027 available?
Yes
Maintenance contract according to SVGW leaflet W10027 available?
No
Maintenance contract according to SVGW leaflet W10027 available?
Performance (l/s)
Please Enter Performance
Total (l/s)
Please Enter Total
A system separator requires a special permit, including a maintenance contract, is this available?
Yes
A system separator requires a special permit, including a maintenance contract, is this available?
No
A system separator requires a special permit, including a maintenance contract, is this available?
Start of installation work
Please enter start of installation work
Meter installation can be done on
Please Enter Meter installation Date
Estimated completion
Please Enter date of estimation
Attachment
Scheme
Floor plans
This field is mandatory
Drag & drop to upload document
Upload your papers and documents here
Upload Document
I hereby declare that all the information I have provided is complete and correct.
This field is mandatory
Submit
Contact
Quick Links
Karriere & Jobs
Report the move
Current prices & tariffa